Skip to content
Halloran & SonsPlumbing & Gas

Pricing

How we quote — and why there's no price list

You want a number. We understand why. But the honest version of that number depends on your house, so here is exactly how we build a quote instead.

Real projects

What our recent jobs actually cost

These are bands from the projects published on this site, with the property type attached — because that is what drives the number.

Value bands from recent Halloran & Sons projects
ProjectPropertyDurationValue band
Main bathroom and ensuite, 1920s bungalowHampton1920s Californian bungalowFive weeks on site, across a nine-week program$28–34k
Hydronic heating retrofit, 1960s brick veneerBeaumaris1960s brick veneer, single storeyNine days on site$22–28k
Kitchen and laundry, Edwardian weatherboardElsternwick1910s Edwardian weatherboardThree weeks on site across the wider renovation$16–20k
Stack replacement and bathroom, 1930s flatBrighton1930s Art Deco apartment blockFour weeks, including a two-week wait for owners corporation approval$18–24k for the bathroom; stack works billed to the owners corporation
Continuous flow conversion, 1970s split levelBlack Rock1970s split-level, two storeyTwo days, with a temporary supply in place overnight$4.5–6k
Bathroom in a heritage overlay, Victorian terraceMalvern1880s Victorian terraceFour weeks on site$24–30k

Bands reflect the plumbing scope on each project at the time it was completed. They are published so you can calibrate expectations — not as an offer.

Always in our quotes

  • Strip-out, disposal and site protection
  • All rough-in — water, waste and vents
  • Waterproofing hold points and inspections
  • Fit-off of all fixtures and tapware
  • Pressure testing and commissioning
  • Compliance certificates for gas and plumbing
  • Daily site clean

Stated as exclusions

We list these explicitly so you can compare quotes properly. A cheaper quote often differs here rather than on rates.

  • Fixtures and tapware supply (unless you ask us to supply)
  • Tiling, plastering and painting
  • Electrical work
  • Structural repairs found after strip-out
  • Sewer or stack replacement, if the line proves to be failed
  • Asbestos removal, which requires a licensed removalist

Questions

What people ask about quotes

Why won't you publish a price list?
Because a bathroom in a 1920s bungalow on stumps and a bathroom in a 2015 slab home are different jobs with the same name. Any number we published would be wrong for most people who read it, and misleading for the rest.
What does a quote actually include?
A fixed price itemised by stage, a written scope in plain language, a week-by-week program showing which trade is on site when, and an explicit list of exclusions. The exclusions matter most — that is where variations come from.
How are variations handled?
We stop, photograph or film what we have found, and give you options in writing including the option of doing nothing. Work does not continue until you approve. Nothing reaches your invoice that you have not agreed to first.
Do you ask for a deposit?
For renovation projects, yes — a deposit at acceptance and progress payments tied to completed stages, never to dates. You are paying for work that has been done, not time that has passed.

Quotes issued by Halloran & Sons Plumbing Pty Ltd, VIC Lic. XXXXX.