Skip to content
Halloran & SonsPlumbing & Gas

Bathroom · Hampton

Main bathroom and ensuite, 1920s bungalow

Two bathrooms reconfigured in a period bungalow, working around original floor joists and a sewer line that turned out to be in worse shape than anyone expected.

Property

1920s Californian bungalow

Duration

Five weeks on site, across a nine-week program

Value band

$28–34k

Occupied

Family stayed in the house throughout — the main bathroom was staged so one was always usable

The brief

We wanted to keep the character of the house but stop living with a 1980s renovation that was falling apart. The main bathroom had to work for two kids, and we wanted an ensuite off the main bedroom without losing the bedroom's proportions.
Before
Photo to commissionOriginal 1980s bathroom, wide shot showing the failing shower base and dated tiling.
During
Photo to commissionFloor up, joists exposed and sistered, new waste set out. Camera footage of the cracked sewer on a screen in shot.
After
Photo to commissionFinished main bathroom, natural light, freestanding bath. Second frame of the completed ensuite.

What we found

Every renovation has surprises. Publishing ours is the point — this is what a variation actually looks like, and how it got handled.

  • The 1980s renovation had been laid directly over the original floorboards with no proper fall to the waste — the shower had been draining into the subfloor for years.
  • Two floor joists under the old shower base had rot and needed sistering before anything could be set out.
  • The earthenware sewer line under the house had a cracked section about three metres in from the boundary. We showed the client the camera footage and replaced that run while the floor was already up — far cheaper than returning for it later.
  • The original copper water lines were sound and were retained, which kept cost down.

Scope of works

  • Strip-out of both existing bathrooms
  • Subfloor repair and joist sistering
  • Replacement of the damaged sewer run
  • New rough-in for main bathroom and new ensuite
  • Waterproofing coordination and hold-point inspections
  • Full fit-off — two showers, freestanding bath, two vanities, two toilets

Trades coordinated

  • Carpenter
  • Waterproofer
  • Tiler
  • Electrician
  • Plasterer

Products specified

  • Caroma
  • Methven
  • Reece
They found the cracked sewer line and rotten joists in the first week and told us straight away, with photos. It cost more than the original quote but we knew exactly why, and they showed us the alternative. That is the bit other builders never do.
Homeowner, Hampton

Other projects