Bathroom · Malvern
Bathroom in a heritage overlay, Victorian terrace
A second bathroom added upstairs in a heritage-overlay terrace where every new service had to be run without touching the facade or the party wall.
Property
1880s Victorian terrace
Duration
Four weeks on site
Value band
$24–30k
Occupied
Family stayed — the original downstairs bathroom remained in use the whole time
The brief
“One bathroom for four people was not working. We knew heritage rules meant we could not do whatever we liked, and we wanted someone who had dealt with that before.”
What we found
Every renovation has surprises. Publishing ours is the point — this is what a variation actually looks like, and how it got handled.
- The party wall could not be chased for waste, so the new stack had to be run internally within a built-out bulkhead the builder framed for us.
- Upstairs floor depth was only just enough for the required fall — we set the shower waste against the external wall to gain the run we needed.
- The existing single bathroom's water supply was too small to serve two bathrooms at once, so the main was upsized from the meter.
Scope of works
- Feasibility assessment against heritage constraints
- New internal stack within a framed bulkhead
- Water main upsized from the meter
- Full rough-in and fit-off for the new upstairs bathroom
- Pressure balancing between the two bathrooms
Trades coordinated
- Builder
- Carpenter
- Waterproofer
- Tiler
Products specified
- Caroma
- Methven
- Reece
“They worked out how to get the waste down without touching the party wall, which two other plumbers had told us was impossible. The bathroom looks like it has always been there.”
Other projects
Bathroom · HamptonMain bathroom and ensuite, 1920s bungalow1920s Californian bungalow$28–34kHeating · BeaumarisHydronic heating retrofit, 1960s brick veneer1960s brick veneer, single storey$22–28kKitchen & laundry · ElsternwickKitchen and laundry, Edwardian weatherboard1910s Edwardian weatherboard$16–20k